COL-11-9.44/13.76
ODOT, District 11, through a quality based selection process, selected
WD to provide engineering design services for this project that involved
the rehabilitation of two sets of twin bridges. Twin six span continuous
steel beam structures on S.R. 11 over U.S. 30 and twin three span
continuous steel beam structures on S.R. 11 over S.R. 154 received
new composite decks, substructure work, painting, approach slabs and
other miscellaneous repairs.
Total Construction Cost: $3,160,470
BEL-148-20.61
ODOT, District 11, through a quality based selection process, selected
WD to provide engineering design services for this project that involved
the rehabilitation of an existing single span non-composite box beam
on S.R. 148 over Moores Run. The bridge received a new box beam superstructure
with reinforced concrete on the existing wall type abutments on piling.
In addition to bridge design, WD provided the following services for
the project, including:
Utility coordination
Development of the project typical sections
Multi-phase maintenance of traffic details and notes
Establishment of profile grades and vertical alignments
Re-establishment of the existing horizontal alignment
Guardrail improvements
Intersection details with T.R. 126
Upgrade of signing and pavement markings within the project limits
Total Construction Cost: $334,730
TUS-516-4.05
ODOT, District 11, through a quality based selection process, selected
WD to provide engineering design services for this project that involved
the replacement of a three span continuous concrete slab on S.R. 516
over the South Fork of Broad Run. The new bridge is a single span
steel beam on integral abutments.
In addition to bridge design, WD provided the following services for
the project, including:
All existing conditions surveys (including property information)
Utility coordination
Development of the project typical sections
Establishment of profile grades and vertical alignments
Re-establishment of the existing horizontal alignment
Guardrail improvements
Upgrade of signing and pavement markings within the project limits
Total Construction Cost: $406,730
TUS-36-17.24
ODOT, District 11, through a quality based selection process, selected
WD to provide engineering design services for this project that involves
the assessment of the existing structure carrying Trenton Avenue over
U.S. 36.
In addition to bridge design, WD provided the following services for
the project, including:
All existing conditions surveys (including property information)
Utility coordination
Development of the project typical sections
Establishment of profile grades and vertical alignments
Re-establishment of the existing horizontal alignment
Guardrail improvements
Upgrade of signing and pavement markings within the project limits
Total Estimated Construction Cost: $3,190,000
COL-154-10.92
WD, on a task order from a general engineering services contract with
ODOT, District 11, provided engineering design services for this project
which involved the replacement of an existing single span box beam
superstructure with a reinforced concrete deck with abutment modifications
on S.R. 154 over Little Bull Creek. WD provided all bride design,
including phase construction details.
Total Construction Cost: $586,300
COL-30-7.20
WD, on a task order from a general engineering services contract with
ODOT, District 11, provided engineering design services for this project
which involves the replacement of an existing non-composite box beam
superstructure with a single span composite box beam superstructure
with a reinforced concrete deck.
Total Estimated Construction Cost: $343,850
Carrollton Signals
WD, on a task order from a general engineering services contract
with ODOT, District 11, provided engineering design services for
this project. The project involved the installation of new energy
efficient traffic signals with integrated traffic demand devices
at five locations within the Village of Carrollton. The new mast
arm signals replaced existing span wire configurations. This project
was funded as a part of the American Recovery and Reinvestment Act
and was completed and an accelerated design schedule.
In addition to bridge design, WD provided the following services
for the project, including:
• All existing conditions surveys (including establishing
existing right of way and centerlines)
• Utility coordination
• Railroad coordination
• Evaluation of ADA compliance and design of pedestrian facilities
• Upgrade of all signals within the project limits
• Mast arm and strain pole design
• Provided preemption capabilities to all signals
• Upgrade of signing and pavement markings within the project
limits
Total Estimated Construction Cost: $599,803
BEL-Powhatan Point Signal
WD, on a task order from a general engineering services contract with
ODOT, District 11, provided engineering design services for this project.
The project involved the installation of new traffic signal at the
intersection of S.R. 7 and S.R. 148, replacing the existing four-way
stop condition. WD provided all surveying and traffic engineering
services necessary to complete the project.
Total Estimated Construction Cost: $114,920