District 5
< back to state map
Click the project to view details.
MUS-CR 82-2.14 (Arch Hill Rd)
The Muskingum County Engineer’s Office, through a quality based process, selected WD to provide engineering design services for this project which involved the replacement of an existing single span structurally deficient truss bridge over Salt Creek. The proposed design included a box-beam bridge with approach roadway construction, including: grading, drainage, and detouring traffic.
Total Construction Cost: $1,138,121 (includes Part 1)
MUS-CR 696-0.12 (Main St)
The Muskingum County Engineer’s Office, through a quality based process, selected WD to provide engineering design services for this project which involved the replacement of an existing three-span T-beam structure over Moxahala Creek. The proposed design incorporated a three-span composite box beam bridge with wall type abutments and cap and column piers and approach roadway construction, including: grading, drainage, and detouring traffic.
Total Estimated Construction Cost: $1,326,550
Licking County Rest Area
(LIC-70-17.78)
The General Services Division of the Office of the State Architect selected to provide a site survey of the existing rest area along Interstate Route 70 in Licking County. The project included obtaining all existing conditions within a 69.69 acre area on both sides of the Interstate, locating property and right-of-way boundaries, establishing easements, a tree inventory, and locating wetland areas. The survey was utilized in the preparation of the new rest area facility.